Tatra T813 8x8 PROFA in 1:10 scale
- Zwiadowca Will
- Teoretyk
- Posty: 87
- Rejestracja: 2013-03-22, 16:02
- Imię: Michał
- Lokalizacja: Wrocław
- Otrzymał podziękowań: 2 razy
-
- VIP Member
- Posty: 285
- Rejestracja: 2006-07-12, 16:23
- Imię:
- Lokalizacja: Czech Republik
- Otrzymał podziękowań: 3 razy
New fortification of halfaxle
Photo guide to new tatra half axle fixation
on small gear there is only need center hole 6H7 and thread M6 for fix screw
Centering of drill, one of the teeth must face upwards
At first mill a recesses and then made thread M6 for fix screw
shortening the large gear on lathe
centering of tube "voditko" by preparation tool on "X" and "Y" axis and fix mill table
at first centering drill, then sequentially larger diameters up to 13mm, last thread M14x1
milled top surface
second preparation tool, this is for drill 4x hole for thread M2
the same work from the other side
labeling angles to swing halfaxles
labeling line for cutting by angle Grinder cutted - voditko and gearbox cover too
and now made a fixing nut
it is necessary to strongly tighten the nut as a counter nut
through the voditko drill holes in the nut
followed drilling from the other side and finish on the lathe
finale, fix ballbearings to inside of halfaxle and glue by Loctite
fixing nut is mounted to voditko by 4x M2 hexagon socket screws, to security ensure from below
milled upper and lower surface of fixing nut
drill a recesses and then mill to finally
DONE!
More time was spent documentation the work than the work itself :&
on small gear there is only need center hole 6H7 and thread M6 for fix screw
Centering of drill, one of the teeth must face upwards
At first mill a recesses and then made thread M6 for fix screw
shortening the large gear on lathe
centering of tube "voditko" by preparation tool on "X" and "Y" axis and fix mill table
at first centering drill, then sequentially larger diameters up to 13mm, last thread M14x1
milled top surface
second preparation tool, this is for drill 4x hole for thread M2
the same work from the other side
labeling angles to swing halfaxles
labeling line for cutting by angle Grinder cutted - voditko and gearbox cover too
and now made a fixing nut
it is necessary to strongly tighten the nut as a counter nut
through the voditko drill holes in the nut
followed drilling from the other side and finish on the lathe
finale, fix ballbearings to inside of halfaxle and glue by Loctite
fixing nut is mounted to voditko by 4x M2 hexagon socket screws, to security ensure from below
milled upper and lower surface of fixing nut
drill a recesses and then mill to finally
DONE!
More time was spent documentation the work than the work itself :&